It depends on who builds the station and whether it will be open to the public. Answer at most three questions and we will show you which programme fits you today, on what terms, and how we can help.
Operational Programme Transport
Municipalities and companies alike can apply. The guide below shows which call fits your project.
Accepting applications18 days left
Call No. 44
For cars along selected sections of the D3, D6 and D11 motorways and in 20 listed municipalities.
up to 70 %of eligible costs
Accepting applications18 days left
Call No. 45
Charging points up to 22 kW, typically in car parks and streets.
up to 80 %of eligible costs
Accepting applications48 days left
Call No. 46
For cars anywhere in Czechia, not limited to selected sections.
up to 55 %of eligible costs
Status verified on
We will write when a new call opens, a deadline approaches or the conditions change.
This signs you up to MyBox subsidy news. A confirmation comes by e-mail; unsubscribe any time.
Subsidy guide
At most three questions and no technical jargon, just what you know about your project. At the end you will see how much the programme covers, when to apply and what we prepare for you.
Status verified on
Question 1 of 3
Accepting applicationsApplications from 9 October to 7 December 2026, 2 p.m.18 days left
OPD3 · call No. 45 · standard charging up to 22 kW
The call is not only for municipalities: any company or municipality with a Czech company ID that owns the stations and opens them to anyone can apply.
What the project must meet
Caps per station
Planning fast charging instead?
Accepting applicationsTwo calls, deadlines by location in the table
OPD3 · calls No. 44 and 46 · fast charging
Two calls are open and the location decides: call No. 44 in priority areas, call No. 46 anywhere else in Czechia.
| Call No. 44 | Call No. 46 | |
|---|---|---|
| Where | Sections of the D3, D6 and D11 motorways within 3 km of an exit, and 20 listed municipalities | Anywhere in Czechia |
| Grant | up to 70 % | up to 55 % |
| Minimum | 6 fast-charging stations | 10 stations, each from 150 kW |
| Cap per station | CZK 0.9 to 3.9 million by power (50 to 350 kW) | CZK 1.9 million at 150 kW, + CZK 10 000 for each extra kW |
| Applications | 9 Oct – 7 Dec 2026 | 14 Oct 2026 – 6 Jan 2027 |
What the project must meet
Will cars stay for hours?
Nothing todayThere is no programme for private stations today
No grant
The OPD3 calls only support stations open to anyone. The Elektromobilita Guarantee of the National Development Bank ended on 14 October 2024, and the Ministry of Industry said at the time that it was not planning another call. OP TAK has no call covering stations, not even in its schedule.
If you open the station to anyone, around the clock, you can also apply under the OPD3 calls. This applies to companies and municipalities alike.
Accepting applicationsApplications until 30 November 2026, 12 noon, or until the money runs out11 days left
Modernisation Fund · TRANSCom
Companies operating road freight transport can apply; the new vehicles replace retired ones.
What the project must meet
Only on conditionsOnly if the building installs solar at the same time
Nová zelená úsporám · apartment buildings
For homeowner associations and housing cooperatives this is a subsidised loan, not a grant. A charging station is an eligible cost only if the building is also installing supported photovoltaics. Nothing supports a station on its own today.
What the project must meet
Only on conditionsBanks will offer the loan during autumn 2026
Nová zelená úsporám · family homes
The direct grant for a home charging station ended on 10 November 2025. Since 25 June 2026 the station is an eligible cost in an interest-free loan, but only together with photovoltaics.
What the project must meet
Before you apply
Starting work
Only after you submit the application. Before that you must not start building or sign a binding order. The first legally enforceable commitment to order equipment already counts as starting work, and such a project then gets no grant.
Studies, permits and project preparation do not count as starting work. That is why it pays to have the technical design and budget ready in advance and to choose the supplier only under the procurement rules.
Apply first, order second
Process
We go through the location, the number and type of stations and which programme the plan falls under. The available grid capacity is confirmed bindingly by the distribution system operator, not by the station supplier.
We hand the solution design, the grid connection documents and a budget broken down by station to you or your application administrator. You file the application.
You choose the supplier under the procurement rules. We prepare the technical parameters the tender documentation can be based on.
If you choose us in the tender, we deliver and install the stations and arrange all mandatory inspections.
We monitor stations connected to MyBox Cloud remotely. Service cannot be paid from the grant, so include it in the operating budget.
For logistics, a hospital, a developer and an apartment building.
You file it, or an administrator of your choice does. We prepare the technical design, grid connection documents and budget the application needs, and hand them to you or to them.
Both. Applicants can be self-employed persons or legal entities with a Czech company ID who own the stations and open them to the public. One applicant may submit at most two applications to a call.
It does if the car park is open to the public and anyone can charge there. A garage only for staff and visitors does not. A barrier or paid parking is fine as long as anyone can drive in. The station must also be in operation 24 hours a day, 7 days a week.
For five years the station must stay open to the public around the clock, and an ordinary fault must be repaired within 7 days. Every charging park must accept card or contactless payment without registration; for points below 50 kW an online QR code payment is enough. A customer line, market-based and non-discriminatory prices and, for points up to 22 kW, smart charging are mandatory.
Project readiness is scored. A project that has a building permit, or does not need one, comes out best. The assessor also looks at how the land is secured.
Only after completion, as the grant is paid retrospectively. You therefore have to pre-finance the project. It must be physically finished by 31 December 2029 at the latest, and costs are eligible until 30 June 2029.
Not for the same costs. The OPD3 conditions prohibit cumulating support and also treat costs shared with stations funded from other calls as ineligible, such as a shared grid connection or transformer station.
Money
The percentage applies only to eligible costs, up to the cap per station. In call No. 45 that is CZK 220 000 for a ground-mounted station with one charging point, CZK 320 000 with two or more, and CZK 70 000 or 100 000 on a wall or pole.
Eligible costs are the project documentation for the permit, the station with installation, the grid connection, a transformer station, groundwork, the payment system and the connection fee. Land, preparing the application, service and VAT are not.
Budget without VAT and plan to pre-financeEvaluation
The score decides, not the order of submission. Applications are ranked by score and receive support until the allocated funds run out.
Seventy percent of the score is cost-effectiveness. A project asking for a lower grant per station gets more points. A lower support rate brings more: one point for every percentage point below the maximum. Whoever asks for the highest possible rate gets zero points for it.
The score decides, not speedWe help with the technical design and a budget broken down by station before you submit. The applicant or their grant consultant files the application.