Project brief
The goal of the project is the systematic electrification of the vehicle fleet across 16 branches in the Czech Republic, together with building matching charging infrastructure at each site. The emphasis is on a flexible approach to installation that reflects the real operational needs of every branch and allows investment to be planned efficiently, without committing to one large roll-out at once. The concept also accounts for long-term growth and is designed as a scalable system ready for further expansion as the fleet is progressively electrified.

The solution delivered
The solution is designed as a gradual roll-out of MyBox charging stations across the individual OMEXOM branches.
Charging stations are currently installed at the following locations:
Location | Stations | Model |
|---|---|---|
Plzeň | 1× | MyBox Post |
Brno | 5× | MyBox Profi |
Česká Lípa | 5× | MyBox Profi |
Ústí nad Labem | 2× | MyBox Profi |
Litoměřice | 1× | MyBox Post |
Nekmíř | 5× | MyBox Profi |
Domažlice | 1× | MyBox Profi |
Total | 20× | 7 locations |
Altogether this is a combination of MyBox Profi and MyBox Post AC charging stations, matched to the differing operational needs of each site.
Installing MyBox AC charging stations
Charging stations are installed step by step, according to how heavily the vehicle fleet is used at the given branch. The project uses the MyBox Profi and MyBox Post models.
This approach makes it possible to adapt the solution flexibly to the specific conditions of each site while keeping a single technological standard. At the same time, investment can be managed efficiently and sufficient charging capacity provided exactly where it is genuinely needed.
Power output and durability
The chosen stations allow two vehicles to be charged simultaneously at up to 2× 22 kW, which covers the needs of ordinary company operations.
The emphasis was placed not only on power output, but also on long-term durability and ease of use:
Robust construction (resistant to weather and vandalism)
Intuitive operation with no complicated set-up
Charging status seen at a glance thanks to LED indicators
The stations are designed to run trouble-free in demanding conditions while also representing the company’s modern technological standards.
Smart features and technology
One of the key elements of the solution is integration into the MyBox ecosystem, which enables advanced management and optimisation of operations:
Cloud connection – remote control, monitoring and station management
OCPP communication – integration into higher-level systems
Dynamic load management (DLM) – optimising power draw across the whole site
User authorisation (RFID) – access control and an overview of usage
Option to connect photovoltaics – using surplus energy for charging
Thanks to these features, each branch has full control over both operations and charging costs.
Key elements and benefits of the project
The solution is built on a gradual roll-out across 16 branches using different station types according to specific operational needs. This approach allows the infrastructure to be scaled flexibly, spreads investment efficiently and keeps the system ready for further expansion. The result is reliable fleet operation, optimised energy use thanks to smart control, and lower costs.
Conclusion
The cooperation between OMEXOM and MyBox represents an effective model for the gradual electrification of a company fleet. The flexible approach, the combination of station types and the option to expand further add up to a long-term sustainable solution that matches the real needs of day-to-day operations.
The project confirms that a gradual roll-out of charging infrastructure is an effective route to modernising a corporate vehicle fleet without the need for high one-off investment.
Considering a similar solution?